Video walkthrough · Solar PV NABCEP

Solar PV NABCEP Practice Test Video

Watch the Solar PV NABCEP practice test video walkthrough, review the questions, download the free PDF and start an online mock exam.

Free sample · Solar PV NABCEPQ1
Before energizing a newly installed PV system, which document should the installer review to confirm all components meet the design specifications?
Correct — A. Approved construction drawings and equipment submittals establish what was engineered and what was approved by the AHJ. Comparing as-built conditions to these documents catches substitutions or omissions before the system is energized.
↑ Tap an answer to check it
Watch & learn

Solar PV NABCEP exam — full Q&A walkthrough

Every question read aloud with the answer explained. Play it on your commute, then test yourself.

Sample questions

Try Solar PV NABCEP questions now

  1. Q1Before energizing a newly installed PV system, which document should the installer review to confirm all components meet the design specifications?

    Show answer

    ✓ Correct answer: The approved construction drawings and equipment submittals

    Approved construction drawings and equipment submittals establish what was engineered and what was approved by the AHJ. Comparing as-built conditions to these documents catches substitutions or omissions before the system is energized.

    Open the full explanation page →

  2. Q2During a visual pre-commissioning inspection, which condition would be an immediate reason to halt energization?

    Show answer

    ✓ Correct answer: Exposed, unprotected DC conductors

    Exposed, unprotected DC conductors present a shock and arc-flash hazard. NEC and OSHA requirements mandate all conductors be properly insulated and protected before any circuit is energized.

    Open the full explanation page →

  3. Q3When inspecting module-level power electronics (MLPEs) during pre-commissioning, the technician should verify that each device is:

    Show answer

    ✓ Correct answer: Properly grounded or bonded per the manufacturer's instructions

    MLPEs such as microinverters and DC optimizers must be grounded or bonded per the manufacturer's instructions and the NEC to prevent shock hazards and ensure proper fault current paths.

    Open the full explanation page →

  4. Q4What is the primary purpose of a continuity test performed on equipment grounding conductors (EGC) before commissioning?

    Show answer

    ✓ Correct answer: To verify a low-resistance fault-current path exists from all metallic parts to ground

    A continuity test on EGCs confirms that a low-impedance path exists for fault current to travel to ground, allowing overcurrent protection to operate quickly and safely in the event of a ground fault.

    Open the full explanation page →

  5. Q5A technician measures 0.3 ohms between the grounding electrode conductor connection point and a remote PV array frame during a bonding continuity check. Which statement is most accurate?

    Show answer

    ✓ Correct answer: The reading is acceptable; NEC does not specify a maximum resistance for equipment bonding continuity

    NEC Article 250 does not impose a specific maximum ohmic value for equipment bonding continuity; the requirement is a 'permanent and effective' low-impedance path. The test verifies conductivity, and acceptance criteria come from the commissioning specification or industry practice rather than a single NEC number.

    Open the full explanation page →

  6. Q6When measuring the open-circuit voltage (Voc) of a PV string, the measured value is lower than the temperature-corrected expected value. What is the most likely cause?

    Show answer

    ✓ Correct answer: One or more modules in the string are bypassed or shaded

    A string Voc lower than expected typically indicates a module is being bypassed (by its own bypass diode due to shading or damage) or a module is missing from the string, reducing the series voltage.

    Open the full explanation page →

Unlock everything

Full Solar PV NABCEP bank + unlimited mocks

Try 30 questions free. Unlock the complete Solar PV NABCEP question bank, every explanation, and unlimited timed mock exams. Practice on any device.

Unlock Solar PV NABCEP →
Cramming?
$2.99
/ week · per exam
Best value
$6.99
/ month · per exam