Solar PV Professional Exam Study Guide
Study for the Solar PV Professional Exam with exam topics, practice questions, a free PDF, video walkthrough and timed mock exam links.
How to study for Solar PV Professional Exam
- Read the topic list so you know what the exam is likely to cover.
- Answer the free practice questions and read every explanation.
- Download the PDF for offline review.
- Use timed mock exams when your untimed practice feels comfortable.
Topics to review
- Core formulas and field calculations
- Codes, standards and compliance
- Safe work practices and PPE
- Tools, materials and on-site reference
Try Solar PV Professional Exam questions now
Q1According to OSHA requirements, at what height is fall protection required when installing rooftop PV systems?
Show answer
✓ Correct answer: 6 feet
OSHA requires fall protection for workers at heights of 6 feet or more in construction activities, which includes PV installation on rooftops.
Q2What is the required minimum bending radius for PV source circuit conductors in conduit as per NEC 2017?
Show answer
✓ Correct answer: At least 8 times the diameter of the conductor
NEC 2017 specifies that the minimum bending radius for PV source circuit conductors in conduit should be at least 8 times the diameter of the conductors to prevent damage to insulation.
Q3Which of the following is required when installing a roof-mounted PV array to maintain the fire classification of a roof?
Show answer
✓ Correct answer: Providing a minimum 3-foot wide clear access pathway from eave to ridge
To maintain a roof's fire classification, a minimum 3-foot wide clear access pathway from eave to ridge is required as per fire code requirements for PV installations.
Q4When installing a DC-coupled battery system with a PV array, what safety procedure is required before connecting the battery to the system?
Show answer
✓ Correct answer: Verifying that all breakers and disconnects are in the open position
Verifying that all breakers and disconnects are open is a critical safety procedure before connecting a battery to prevent unintended energization and potential electrical hazards.
Q5Which of the following markings is required on PV system disconnecting means according to NEC 2017?
Show answer
✓ Correct answer: 'PV SYSTEM DISCONNECT'
NEC 2017 requires that all PV system disconnecting means be permanently marked as 'PV SYSTEM DISCONNECT' for clear identification during maintenance or emergency situations.
Q6According to NFPA 70E, what is required for working on energized PV systems?
Show answer
✓ Correct answer: An energized electrical work permit
NFPA 70E requires an energized electrical work permit when working on energized PV systems to ensure proper risk assessment and safety protocols are followed.
Full Solar PV Professional Exam bank + unlimited mocks
Try 30 questions free. Unlock the complete Solar PV Professional Exam question bank, every explanation, and unlimited timed mock exams. Practice on any device.
Unlock Solar PV Professional Exam →