Free sample · Solar PV Professional ExamQ1
According to OSHA requirements, at what height is fall protection required when installing rooftop PV systems?
Correct — D. OSHA requires fall protection for workers at heights of 6 feet or more in construction activities, which includes PV installation on rooftops.
↑ Tap an answer to check it
Free questions

Solar PV Professional Exam Questions

Open each answer, read the explanation, then continue into the full practice flow.

  1. Q1According to OSHA requirements, at what height is fall protection required when installing rooftop PV systems?

    Show answer

    ✓ Correct answer: 6 feet

    OSHA requires fall protection for workers at heights of 6 feet or more in construction activities, which includes PV installation on rooftops.

    Open the full explanation page →

  2. Q2What is the required minimum bending radius for PV source circuit conductors in conduit as per NEC 2017?

    Show answer

    ✓ Correct answer: At least 8 times the diameter of the conductor

    NEC 2017 specifies that the minimum bending radius for PV source circuit conductors in conduit should be at least 8 times the diameter of the conductors to prevent damage to insulation.

    Open the full explanation page →

  3. Q3Which of the following is required when installing a roof-mounted PV array to maintain the fire classification of a roof?

    Show answer

    ✓ Correct answer: Providing a minimum 3-foot wide clear access pathway from eave to ridge

    To maintain a roof's fire classification, a minimum 3-foot wide clear access pathway from eave to ridge is required as per fire code requirements for PV installations.

    Open the full explanation page →

  4. Q4When installing a DC-coupled battery system with a PV array, what safety procedure is required before connecting the battery to the system?

    Show answer

    ✓ Correct answer: Verifying that all breakers and disconnects are in the open position

    Verifying that all breakers and disconnects are open is a critical safety procedure before connecting a battery to prevent unintended energization and potential electrical hazards.

    Open the full explanation page →

  5. Q5Which of the following markings is required on PV system disconnecting means according to NEC 2017?

    Show answer

    ✓ Correct answer: 'PV SYSTEM DISCONNECT'

    NEC 2017 requires that all PV system disconnecting means be permanently marked as 'PV SYSTEM DISCONNECT' for clear identification during maintenance or emergency situations.

    Open the full explanation page →

  6. Q6According to NFPA 70E, what is required for working on energized PV systems?

    Show answer

    ✓ Correct answer: An energized electrical work permit

    NFPA 70E requires an energized electrical work permit when working on energized PV systems to ensure proper risk assessment and safety protocols are followed.

    Open the full explanation page →

  7. Q7When installing a ground-mounted PV array, what is the minimum burial depth required for direct burial conductors?

    Show answer

    ✓ Correct answer: 24 inches

    NEC requires a minimum burial depth of 24 inches for direct burial conductors to protect them from physical damage and meet code compliance.

    Open the full explanation page →

  8. Q8What is the correct method for bonding microinverters to the PV module racking system?

    Show answer

    ✓ Correct answer: Using the manufacturer's specified hardware and torque specifications

    Using the manufacturer's specified hardware and torque specifications ensures proper bonding of microinverters to the racking system, maintaining electrical continuity and safety.

    Open the full explanation page →

  9. Q9When installing a rapid shutdown system for a residential PV installation, at what distance from the array must voltage be reduced according to NEC 2017?

    Show answer

    ✓ Correct answer: Within 1 foot of the array

    NEC 2017 requires that PV system conductors more than 1 foot from the array must be reduced to 30V or less within 30 seconds during rapid shutdown.

    Open the full explanation page →

  10. Q10What is the maximum allowable temperature rating for conductors in a combiner box that can reach 60°C under normal operation?

    Show answer

    ✓ Correct answer: 75°C

    Conductors used in a combiner box that can reach 60°C should have a temperature rating of at least 75°C to ensure safe operation and prevent insulation degradation.

    Open the full explanation page →

Unlock everything

Full Solar PV Professional Exam bank + unlimited mocks

Try 30 questions free. Unlock the complete Solar PV Professional Exam question bank, every explanation, and unlimited timed mock exams. Practice on any device.

Unlock Solar PV Professional Exam →
Cramming?
$2.99
/ week · per exam
Best value
$6.99
/ month · per exam