Video walkthrough · Solar PV Design Exam Prep

Solar PV Design Exam Prep Practice Test Video

Watch the Solar PV Design Exam Prep practice test video walkthrough, review the questions, download the free PDF and start an online mock exam.

Free sample · Solar PV Design Exam PrepQ1
When reviewing local authority having jurisdiction (AHJ) requirements for a commercial PV installation, which of the following would typically be the MOST important to consider first?
Correct — D. Setback requirements from the building code are crucial to consider early in the design phase as they directly impact where PV equipment can be placed and may significantly constrain system size and configuration.
↑ Tap an answer to check it
Watch & learn

Solar PV Design Exam Prep exam — full Q&A walkthrough

Every question read aloud with the answer explained. Play it on your commute, then test yourself.

Sample questions

Try Solar PV Design Exam Prep questions now

  1. Q1When reviewing local authority having jurisdiction (AHJ) requirements for a commercial PV installation, which of the following would typically be the MOST important to consider first?

    Show answer

    ✓ Correct answer: Setback requirements from the building code

    Setback requirements from the building code are crucial to consider early in the design phase as they directly impact where PV equipment can be placed and may significantly constrain system size and configuration.

    Open the full explanation page →

  2. Q2Which section of the 2017 NEC specifically addresses solar photovoltaic systems?

    Show answer

    ✓ Correct answer: Article 690

    Article 690 of the National Electrical Code (NEC) is dedicated specifically to solar photovoltaic systems and contains the requirements for installation, operation, and maintenance of these systems.

    Open the full explanation page →

  3. Q3When reviewing utility interconnection requirements, which of the following is typically required for grid-connected PV systems?

    Show answer

    ✓ Correct answer: External disconnect switch

    An external disconnect switch is typically required by utilities to allow them to isolate the PV system from the grid during maintenance or emergency situations.

    Open the full explanation page →

  4. Q4A homeowners association (HOA) covenant restricts roof-mounted solar equipment visibility from the street. Which design approach would best address this requirement?

    Show answer

    ✓ Correct answer: Place the array on the rear-facing roof slope

    Placing the array on the rear-facing roof slope would typically make it less visible from the street, helping comply with HOA visibility restrictions while still allowing for solar installation.

    Open the full explanation page →

  5. Q5According to the 2017 NEC, what is the required minimum clear space in front of electrical equipment operating at 600V or less?

    Show answer

    ✓ Correct answer: 36 inches

    NEC 110.26(A)(1) requires a minimum working space of 3 feet (36 inches) in front of electrical equipment operating at 600V or less to ensure safe access for installation and maintenance.

    Open the full explanation page →

  6. Q6When reviewing project criteria for a new PV installation, which document would contain the specific structural requirements for roof loading?

    Show answer

    ✓ Correct answer: Structural engineering report

    Structural engineering reports contain the analysis of roof loading capacity, which is critical for determining if the roof can support the additional weight of a PV system.

    Open the full explanation page →

Unlock everything

Full Solar PV Design Exam Prep bank + unlimited mocks

Try 30 questions free. Unlock the complete Solar PV Design Exam Prep question bank, every explanation, and unlimited timed mock exams. Practice on any device.

Unlock Solar PV Design Exam Prep →
Cramming?
$2.99
/ week · per exam
Best value
$6.99
/ month · per exam