Free sample · PVDS Test PrepQ1
When reviewing local authority having jurisdiction (AHJ) requirements for a commercial PV installation, which of the following would typically be the MOST important to consider first?
Correct — D. Setback requirements from the building code are crucial to consider early in the design phase as they directly impact where PV equipment can be placed and may significantly constrain system size and configuration.
↑ Tap an answer to check it
Free questions

PVDS Test Prep Questions

Open each answer, read the explanation, then continue into the full practice flow.

  1. Q1When reviewing local authority having jurisdiction (AHJ) requirements for a commercial PV installation, which of the following would typically be the MOST important to consider first?

    Show answer

    ✓ Correct answer: Setback requirements from the building code

    Setback requirements from the building code are crucial to consider early in the design phase as they directly impact where PV equipment can be placed and may significantly constrain system size and configuration.

    Open the full explanation page →

  2. Q2Which section of the 2017 NEC specifically addresses solar photovoltaic systems?

    Show answer

    ✓ Correct answer: Article 690

    Article 690 of the National Electrical Code (NEC) is dedicated specifically to solar photovoltaic systems and contains the requirements for installation, operation, and maintenance of these systems.

    Open the full explanation page →

  3. Q3When reviewing utility interconnection requirements, which of the following is typically required for grid-connected PV systems?

    Show answer

    ✓ Correct answer: External disconnect switch

    An external disconnect switch is typically required by utilities to allow them to isolate the PV system from the grid during maintenance or emergency situations.

    Open the full explanation page →

  4. Q4A homeowners association (HOA) covenant restricts roof-mounted solar equipment visibility from the street. Which design approach would best address this requirement?

    Show answer

    ✓ Correct answer: Place the array on the rear-facing roof slope

    Placing the array on the rear-facing roof slope would typically make it less visible from the street, helping comply with HOA visibility restrictions while still allowing for solar installation.

    Open the full explanation page →

  5. Q5According to the 2017 NEC, what is the required minimum clear space in front of electrical equipment operating at 600V or less?

    Show answer

    ✓ Correct answer: 36 inches

    NEC 110.26(A)(1) requires a minimum working space of 3 feet (36 inches) in front of electrical equipment operating at 600V or less to ensure safe access for installation and maintenance.

    Open the full explanation page →

  6. Q6When reviewing project criteria for a new PV installation, which document would contain the specific structural requirements for roof loading?

    Show answer

    ✓ Correct answer: Structural engineering report

    Structural engineering reports contain the analysis of roof loading capacity, which is critical for determining if the roof can support the additional weight of a PV system.

    Open the full explanation page →

  7. Q7When evaluating utility requirements for a grid-connected PV system, which of the following limitations would MOST directly affect system size?

    Show answer

    ✓ Correct answer: Net metering capacity limits

    Net metering capacity limits directly restrict the maximum size of a grid-connected PV system that can participate in net metering programs, which affects system sizing decisions.

    Open the full explanation page →

  8. Q8Which of the following best describes a key purpose of reviewing construction specification documents during PV system design?

    Show answer

    ✓ Correct answer: To identify required materials and installation methods

    Construction specification documents provide detailed requirements for materials and installation methods that must be followed for a project to be considered compliant, ensuring the PV system meets all required standards.

    Open the full explanation page →

  9. Q9In accordance with the 2017 NEC, what is the minimum distance required between a PV array and the roof ridge to allow for firefighter access?

    Show answer

    ✓ Correct answer: 36 inches

    NEC 690.12(D) requires at least 3 feet (36 inches) of clear space between a PV array and the roof ridge to allow firefighter access and ventilation in case of emergency.

    Open the full explanation page →

  10. Q10When reviewing local zoning ordinances for a ground-mounted PV array, which of the following would typically be MOST restrictive?

    Show answer

    ✓ Correct answer: Height limitations

    Height limitations in zoning ordinances often present the most restrictive challenge for ground-mounted PV arrays, as they directly limit the tilt angle and overall design of the system.

    Open the full explanation page →

Unlock everything

Full PVDS Test Prep bank + unlimited mocks

Try 30 questions free. Unlock the complete PVDS Test Prep question bank, every explanation, and unlimited timed mock exams. Practice on any device.

Unlock PVDS Test Prep →
Cramming?
$2.99
/ week · per exam
Best value
$6.99
/ month · per exam