When conducting a cost analysis for a network upgrade, which factor represents an OPEX consideration rather than CAPEX?

Practise this CCDE Network Design Prep question free, then download the PDF, watch the video walkthrough, or unlock timed mock exams for the full web bank.
Multiple choice — select the best answer
✓ Correct answer: D. Support contracts Support contracts are operational expenditures (OPEX) as they represent ongoing costs over time rather than initial capital investments.